Foundation One is now live

Book your demo
Now live · General availability

Foundation One

The TCSP platform that closes your month in 2 days, not 10.

The TCSP platform for wealth, trust & corporate services firms. Foundation One unifies trust accounting, company secretarial, compliance & KYC, portfolio management and financial operations into one Governed Ledger™ — so every team reports from the same numbers and your month-end close collapses from weeks to days.

Includes a sample migration analysis for your firm — no commitment required.

Privacy-First AI
SOC 2 / ISO 27001
FATCA / CRS
Mauritius HQ
Foundation One
Live
Foundation One Wealth Dashboard showing total net worth, portfolio allocation and performance

Governed & secure by design

AES-256 encryption48 regulated jurisdictionsSOC 2 Type IIISO 27001EU AI Act compliantImmutable audit trail

0

Modules across 17 domains

0

Regulated jurisdictions supported

0%

Uptime SLA target

0-bit

Encryption at rest & in transit

Built for wealth, trust & corporate services firms

Family OfficesTrust CompaniesCorporate Service ProvidersPrivate BanksFund AdministratorsWealth ManagersFiduciary BoutiquesFamily OfficesTrust CompaniesCorporate Service ProvidersPrivate BanksFund AdministratorsWealth ManagersFiduciary Boutiques
Now live · General availability

A giant leap forward for wealth, trust & corporate services

For decades the industry has stitched together spreadsheets, legacy trust systems and point tools. Foundation One ends that — one governed platform for the entire firm, generally available today and onboarding new firms now.

Available now

146

Modules live today

48

Jurisdictions covered

6–12 wks

Typical time to go live

99.99%

Uptime SLA target

Fragmented ledgersOne golden record

Clients, entities, assets, documents, compliance and filings collapse onto a single governed ledger — no reconciliation between systems, ever.

Reactive complianceAutonomous governance

AI agents scan every entity for governance gaps, draft resolutions and keep you audit-ready across 48 regulated jurisdictions.

Closed, on-premise systemsOpen, AI-augmented platform

Cloud-native and API-first, with a privacy-first AI stack certified to the EU AI Act. Built for the next decade, not the last one.

ROI calculator

What is fragmented tooling actually costing you?

Adjust the inputs to your firm. The numbers update live — based on conservative, transparent benchmarks, not marketing claims.

Your firm

Trusts, companies, foundations & structures under administration.

Cross-checking entities across spreadsheets, legacy systems & registers.

Fully-loaded cost per hour for fiduciary ops staff. London & Jersey firms typically run $150–250/hr — set this to your real blended rate.

Assumptions (transparent)

  • • Blended staff cost: $175/hr (your input, fully loaded)
  • • Reconciliation effort: ~0.6hr/entity/week on legacy tooling
  • • Platform targets ~70% reduction in that effort
Estimated annual cost

$4,231,500

Spent each year on reconciliation & manual reporting across your firm.

Recoverable with one governed ledger
$2,962,050/yr
Reporting weeks recovered per year
12 weeks
Reconciliation hours saved per year
16,380 hrs

Foundation One Professional at $64,000/yr pays back in 8 days for a firm like yours.

Board-ready PDF

Send me this as a board-ready PDF for my partner meeting — line-by-line breakdown, assumptions & the TCSP buyer's guide.

Illustrative estimates based on industry benchmarks, not a guarantee of any specific outcome. Actual results depend on your firm's structure, data quality and configuration.

Three connected domains

Trust, wealth & compliance — finally on the same ledger

Most wealth, trust and corporate services firms bolt together a dozen tools to run a single client relationship. Foundation One replaces them with one governed platform.

Trust & Corporate Services

The core domain of the platform.

Administer trusts, companies and boards end to end — from entity incorporation and statutory registers to trust accounting, cap tables and board packs.

  • Client & Entity Management
  • Trust Accounting & Group Consolidation
  • Company Secretarial & Board Pack
  • Cap Table & Trust Asset Custody
  • Real Estate & Digital Assets

Wealth & Investments

Portfolio administration, governed.

Model and reconcile multi-currency portfolios across every asset class, with risk analytics and white-labelled client reporting built in.

  • Portfolio Management & Asset Master
  • Fund Management
  • Wealth Management & Advisory
  • Risk Analytics
  • Client Reporting

Compliance & Regulatory

Proof, not promises.

Run KYC/AML, beneficial-ownership verification and regulatory reporting on one dashboard — FATCA/CRS, ESG/CSRD and a unified regulatory database.

  • Compliance & KYC / BO Verification
  • FATCA / CRS / AEOI & CRS v3.0 Generator
  • Unified Regulatory Dashboard
  • ESG & Impact Reporting
  • CSRD / ESRS Reporter
The platform

146 modules. One data model.

Every module shares the same governed ledger, so a change anywhere is reflected everywhere — instantly and auditably. Explore the seventeen domains that make up Foundation One.

System of record

One relationship, one record — across every team and jurisdiction.

Foundation One links clients, entities, assets and documents into a living graph. Open a trust and the underlying company, bank accounts, beneficiaries and filings are all connected — no swivel-chair, no stale copies.

  • Golden record per relationship
  • Cross-jurisdictional hierarchy
  • Real-time role-based access
  • Lineage for every field
GoldenRecordClientsEntitiesAssetsDocumentsComplianceFilings

Trust & Corporate Services

10
  • Client & Entity Management
  • Ownership Structure Charts
  • Trust Accounting
  • Group Consolidation
  • Company Secretarial
  • Board Meetings / Board Pack
  • Cap Table
  • Trust Asset & Custody
  • Real Estate
  • Digital Assets

Wealth & Investments

6
  • Portfolio Management
  • Asset Master
  • Fund Management
  • Wealth Management & Advisory
  • Risk Analytics
  • Client Reporting

Compliance & Regulatory

7
  • Compliance & KYC
  • BO Verification
  • FATCA / CRS / AEOI
  • CRS v3.0 Generator
  • Unified Regulatory Dashboard
  • ESG & Impact Reporting
  • CSRD / ESRS Reporter

Documents

4
  • Document Production
  • Electronic Signatures
  • Contract Lifecycle Management
  • VDR Analytics

Accounting

11
  • Chart of Accounts
  • Journal Entries
  • General Ledger
  • Payments
  • Financial Snapshot
  • Treasury / Tax / Multi-Ledger
  • VAT Returns
  • Period Close
  • Statements & Import
  • Fixed Assets
  • Budgeting

Human Resources

13
  • Employees
  • Attendance
  • Leave Management
  • Timesheets
  • Performance
  • Recruitment
  • Engagement
  • Compensation
  • Onboarding
  • Offboarding
  • Learning
  • Case Management
  • Payroll

CRM & Sales

17
  • Prospects
  • Engagements
  • Mandate Pipeline
  • Forecast
  • Customers & Contacts
  • Contact 360°
  • Contact Lifecycle
  • To-Dos & Actions
  • CRM Insights & Reports
  • Quotations
  • Sales Orders
  • Invoices
  • Recurring Invoices
  • Form Templates
  • Time & Billing
  • Billing & Fee Management
  • Client Time & Rates

Purchasing

3
  • Suppliers
  • Purchase Orders
  • Purchase Invoices

Projects & Automation

3
  • Projects
  • Tasks
  • Workflows

Integrations

5
  • Email & WhatsApp
  • Banking APIs
  • KYC Providers
  • Microsoft 365
  • Meeting Assistant

AI Tools

6
  • Tailwind AI Assistant
  • Governance Agent
  • AI Act Compliance
  • Privacy-First AI
  • AI Risk Register
  • AI Features

Analytics & Settings

4
  • Reports
  • Company
  • Users
  • General
See it in motion

Foundation One in 60 seconds

Watch the full platform story — from fragmented spreadsheets to one governed ledger, across trust, corporate, wealth and compliance.

Foundation One
What changes on day one

What firms moving off spreadsheets & legacy report

Composite outcomes reported by firms running on Foundation One. We show the mechanism — what actually changes on the platform — not just a percentage. The shift happens when fragmented tooling collapses onto one governed ledger.

Monthly reporting close

Before → After
Before (spreadsheets + legacy)10 days
On Foundation One2 days

The mechanism

A single governed ledger means every team reports from the same numbers — no cross-checking spreadsheets against registers before the board pack goes out.

New client onboarding

Before → After
Before (spreadsheets + legacy)3 quarters
On Foundation One5 weeks

The mechanism

Guided migration maps your existing entity hierarchies, beneficial owners and structures in parallel — your team keeps running on legacy while Foundation One is populated alongside.

Regulator audit reconstruction

Before → After
Before (spreadsheets + legacy)1 week
On Foundation One1 export

The mechanism

Every field change is captured in an immutable, tamper-evident trail with lineage. Auditors get a full export on demand instead of your team rebuilding it from email trails and file history.

Entities per administrator

Before → After
Before (spreadsheets + legacy)~220
On Foundation One1,200+

The mechanism

Workflow automation and the AI Governance Agent absorb the routine review work — filings, reminders, KYC refreshes — so each administrator covers more structures without more headcount.

Composite figures reported by firms migrating off spreadsheets and legacy systems. Not a guarantee of any specific outcome — actual results vary with firm size, structure complexity and data quality at migration. Shown to illustrate the mechanism, not to promise a fixed percentage.

From signed order to live in weeks

A measured path to a single source of truth

Our delivery team has migrated firms from spreadsheets and legacy suites. Most go live inside a quarter.

01

Connect your data

Custodians, banks, registers and existing records flow into Foundation One through pre-built integrations and a typed import pipeline.

02

Configure governance

Define roles, delegation of authority, jurisdictions and four-eye approval workflows to mirror exactly how your firm operates.

03

Run day-to-day

Onboard clients, administer entities, manage portfolios, bill fees and respond to investor queries — all from one console.

04

Demonstrate control

Generate regulator-ready audit packs, board reports and investor statements on demand, with full lineage behind every figure.

Migration, de-risked

Your data, moved safely. Zero unplanned downtime.

We have migrated firms from spreadsheets and legacy trust systems. Our delivery team handles the heavy lifting — historical data cleansing, parallel running and go-live support — so your clients never feel the change.

Guided migration

White-glove data import, entity-hierarchy mapping and historical document ingestion.

Parallel running

Run Foundation One alongside your existing systems until you are confident to cut over.

Zero unplanned downtime

Cutover is planned, rehearsed and reversible. Your obligations stay met throughout.

Live in 6–12 weeks

A typical Professional deployment goes live inside a quarter — not a multi-year programme.

Built for your firm type

A platform shaped by the way you actually work

The same governed core, configured for the obligations and economics of wealth, trust and corporate services firms.

Family Offices

One console for the entire family enterprise

Consolidate operating companies, trusts, foundations and personal holdings into a single governed view — with reporting your principals actually trust.

  • Consolidated net worth across structures & currencies
  • Client 360° view with privacy controls
  • Wealth Management & Advisory + Risk Analytics
  • Co-investment and private deal tracking

38%

average time saved on monthly reporting

Trust by design

Engineered to the fiduciary standard

When you manage other people's wealth, structures and obligations, control is not a feature — it is the product. Foundation One is built around proof, not promises — with a dedicated AI Risk Register and AI Act compliance.

Control-mapped, not claim-mapped

SOC 2 Type II and ISO 27001 are control-mapped — we implement the full controls set. The complete controls matrix and our latest penetration-test report are available to prospects under Mutual NDA.

Standards & frameworks

SOC 2 Type IIControl-mappedISO 27001Control-mappedGDPRCompliantFATCA / CRS / AEOICompliantAI Act readyCompliantAML / KYCCompliant

Foundation One implements the full SOC 2 Type II and ISO 27001 control sets and is fully compliant with the regulatory frameworks above. Independent certification for SOC 2 Type II and ISO 27001 is in progress; until then we are transparent that these are control-mapped, not yet certified — the controls matrix and pen-test are available under NDA.

Encryption everywhere

AES-256 at rest, TLS 1.3 in transit, and customer-managed keys for sensitive vaults.

Granular access control

Role-based permissions down to the field, with time-boxed delegation and break-glass.

Continuous monitoring

Anomalous access and transactions flagged in real time, with SOC triage 24/7.

Resilient infrastructure

Multi-region active-active deployment with 99.99% uptime and nightly verified backups.

Your data stays yours

Full export, anytime. No training on your clients' data. Ever.

Data residency options available
Why Foundation One

Purpose-built beats patched-together

Wealth, trust and corporate services firms have been forced to choose between spreadsheets that don't scale and generic CRMs that don't understand fiduciary work. Foundation One is the third option.

Data model

Legacy: Siloed spreadsheets and disconnected databases
Generic CRM: Built for sales pipelines, not fiduciary structures
Foundation One: Native TCSP data model — one governed golden record

Trust & corporate

Legacy: Manual registers, offline board packs
Generic CRM: Not supported — needs a separate tool
Foundation One: Trust accounting, company secretarial & board packs built in

Compliance & KYC

Legacy: Reactive — discovered during audits
Generic CRM: Basic CRM fields, no AML/PEP screening
Foundation One: KYC, BO verification, FATCA/CRS & ESG/CSRD on one dashboard

AI governance

Legacy: None
Generic CRM: Generic chatbots, no fiduciary guardrails
Foundation One: Subsidiary Governance Agent + EU AI Act compliance (100/100)

Audit trail

Legacy: Reconstructed after the fact
Generic CRM: Limited activity logs
Foundation One: Immutable, real-time lineage for every field

Security & access control

Legacy: Shared logins, no geographic controls
Generic CRM: Application-level permissions only
Foundation One: Database-level row-level security + per-user geo-locking

Client portal

Legacy: Email attachments and shared drives
Generic CRM: Not included — needs a separate tool
Foundation One: Purpose-built portal with per-entity access & approvals

Onboarding

Legacy: Months of manual data entry
Generic CRM: Self-serve, no migration support
Foundation One: Guided migration — most firms live in 6–12 weeks
Comparison

Foundation One vs. the status quo

Most firms shortlist three options: keep extending spreadsheets and legacy tools, build in-house, or adopt a modern TCSP platform. Here is how they actually compare.

Architecture

Single governed ledger

Sheets

In-house

F1

Modules across 17 domains

Sheets

Point tools only

In-house

Only what you build

F1

146 modules

Immutable, tamper-evident audit trail

Sheets

File history

In-house

Build it yourself

F1

Compliance

FATCA / CRS / AEOI compliant

Sheets

Manual, per file

In-house

You maintain

F1

AML / KYC & beneficial-ownership tracking

Sheets

Separate system

In-house

Build it yourself

F1

ESG / CSRD reporting

Sheets

In-house

F1

Security

256-bit encryption, SOC 2 / ISO 27001 control-mapped

Sheets

In-house

Fully on you

F1

Data residency options

Sheets

In-house

F1

Integrations

Open APIs & banking integrations

Sheets

In-house

F1

Migration

Guided migration, parallel running

Sheets

N/A

In-house

Self-migrated

F1

6–12 weeks
Operations

Regulatory updates pushed to live entities

Sheets

Manual re-keying

In-house

You maintain

F1

Commercial

Pricing model

Sheets

Hidden staff cost

In-house

Engineering headcount

F1

Per-entity subscription
IncludedPartial / build yourselfNot available
Pricing

Priced for the business, not per click

Transparent plans that scale with the entities you administer — seats included, overages transparent, no surprises.

AnnualMonthlySave up to 17%

Foundation

For boutique firms getting structured on one governed ledger.

$15,800/ yr

$1,317/mo equivalent · billed annually

Save $2,080
Start with Foundation

Up to 200 entities

15 seats included

  • Core Trust & Corporate Services
  • Document vault & e-signatures
  • Client 360°
  • AI Governance Agent — read-only, 20 runs/month
  • Standard support (business hours)
  • API: not included
Most popular

Growth

For established TCSP firms running all 146 modules.

$36,400/ yr

$3,033/mo equivalent · billed annually

Save $8,000
Choose Growth

Up to 800 entities

35 seats included

  • All 146 modules included
  • API (read-only)
  • Priority support
  • Compliance, ESG/CSRD & AI tools
  • Open integrations & banking APIs
  • Quarterly platform releases

Professional

For multi-jurisdiction firms needing full API & AI tools.

$64,000/ yr

$5,333/mo equivalent · billed annually

Save $12,800
Choose Professional

Up to 2,500 entities

75 seats included

  • Everything in Growth, plus:
  • Full API (read & write)
  • ESG / CSRD reporting suite
  • AI Governance Agent — unlimited runs
  • 24/7 support + dedicated CSM
  • Advanced analytics & board pack

Enterprise

For global groups needing data residency & custom keys.

from$8,500/ month

billed annually · not offered monthly

Talk to Sales

Unlimited entities

Unlimited seats

  • Everything in Professional, plus:
  • SSO / SAML & SCIM provisioning
  • Data residency (EU, UK, MU, US)
  • Customer-managed encryption keys
  • Private connect & dedicated infra
  • Custom SLAs up to 99.99%

Need more?

Additional seats $29/seat/month — add one at a time, no packs required.

Additional entities: $6/entity/mo for the first 250 over your tier, then $4/entity/mo after that.

Stay in tier up to 20% over your entity limit — we'll talk before you jump.

Onboarding & migration

FREE guided migration for new clients, up to 500 entities — $7,500 value, credited in full.

12 months of parallel read access to your legacy system — no cutover cliff.

Guided migration with parallel running. Your team keeps operating on legacy while Foundation One is populated alongside. Scoped after a free assessment.

Rate certainty

Your price is locked for your full first term. No mid-term increases, no surprise repricing.

Free migration assessment before you commit.

Annual billing saves up to 17% — and the rate you sign is the rate you pay.

All plans include the governed ledger, immutable audit trail and unlimited relationships across all 17 domains. SOC 2 / ISO 27001 control-mapped — see the shared responsibility matrix.

Questions, answered

What wealth, trust & corporate firms ask first

If something you care about is not here, our team will answer it on a call — usually within a day.

Still evaluating? Read our security overview or compare plans.

Free buyer's guide

The TCSP Buyer's Guide

A practical framework for evaluating Trust & Corporate Services Provider platforms — what to look for, what to question, and how to de-risk the move off spreadsheets and legacy systems.

  • The 17 domains a modern TCSP platform must unify
  • An 8-criterion evaluation framework
  • Foundation One vs. spreadsheets vs. in-house build
  • 10 questions to ask any vendor — including migration
7-page PDF · ~12 min read · 2026 edition

Get the guide

Enter your work email — we'll send the PDF straight away.

256-bit encrypted · We never share or sell your details.

For new clients

Every new firm gets partner-grade onboarding

From your first demo to go-live, you work with a named team that scopes your migration, protects your rate and keeps your firm running in parallel throughout — no ticket-queue onboarding, no cutover cliff.

No commitment to subscribe. The migration assessment is genuinely free.

Rate certainty

Your price is locked for your full first term — no mid-term increases, no surprise repricing.

Named delivery lead

A dedicated implementation lead and a scoped onboarding window from day one — go live in 6–12 weeks.

Free migration assessment

A no-obligation analysis of your entity data, structures and historical records — scoped before you commit.

Shape the roadmap

Client feedback feeds directly into the module and integration priorities of every quarterly release.

Request a demo

See Foundation One on your own structures

Bring a sample relationship — a trust, a holding company, a portfolio. We will show it running across the platform's trust, wealth and compliance modules in a 45-minute private walkthrough.

  • Your structures, mapped live

    We map a sample entity from your firm and walk through it in 45 minutes.

  • Cross-jurisdiction scenarios

    See how multi-jurisdiction trusts, companies and portfolios connect end to end.

  • Security & compliance briefing

    Under NDA, with our pen-test summary, controls documentation and AI Act compliance score.

Prefer to talk now?

Call our partnerships team on +230 2483744/2483703 or email f1-partners@aphelion-group.com

256-bit encryptedNever shared or soldNDA on request

By submitting, you agree to our privacy notice. We respond within one business day.

Foundation One

Now live · Onboarding new firms

Request a demo